Home > Knowledge > Content

Contact Us

Add:No.168, Kangqiang Road, North Industrial Area, Huangyan, Taizhou, Zhejiang, China

Mob:+8613738590737

Tel:+86-576-84019859

Fax:+86-576-84019959

E-mail:huida@pipingmould.com

PPR Tubing Precautions
Sep 10, 2018

1, PPR Pipe and pipe fittings used hot-melt connection, but not directly in the pipe and pipe wire, and metal pipe connection can be used flange connection, in connection with the water device must be used with a metal insert fittings;

2, in the process of hot melt connection must use the quality of reliable hot melt equipment, it can ensure the quality of welding;

3, when using special scissors to vertical cutting PPR pipe to ensure that the incision to maintain a smooth, no burr;

4, PPR Pipe and fittings welded parts must be clean, to prevent dust damage joint quality; 

5, inserted in the welding, the equipment must be in accordance with the specified time heating pipe and pipe fittings;